Installation of the equipment, systems of tires and descents to the equipment of 330 kV open switchyard CSS 330/35 “Zaporizhzhya WPP”.

Project features

Task:

Work on the installation of 330 kV power equipment and busbar as part of the construction of a new substation CSS 330/35 “Zaporizhzhya WPP” for connection of a wind power plant with a capacity of 500 MW in the Pryazovsky and Melitopolsky district of the Zaporozhye region

Customer:

EDS-ENGINEERING LLC

Period of work:

December 2019 – February 2020

Place of work:

Nadezhdine, Melitopolsky district of the Zaporozhye region

Project description

Company Elmiсo LLC under a subcontract as part of the construction of a new substation CSS 330/35 “Zaporizhzhya WPP” for connection of a wind power plant with a capacity of 500 MW in the Pryazovsky and Melitopolsky districts of the Zaporozhye region in severe winter conditions performed work on the installation of 330 kV power equipment (breaker LTB 420E2 with spring-operated BLG 1002A in the amount of 3 pcs, SF6-filled transformer current TG-362 in the amount of 12 pcs, voltage transformer TVI-362 in the amount of 9 pcs, disconnectors РГ.1а-330/3150 УХЛ1 with drive ПД-14-00 УХЛ1 and ПД-14-010УХЛ1 in the amount of 3 pcs, disconnectors РГ.1б-330/3150 УХЛ1 with drive ПД-14-00 УХЛ1 and ПД-14-010УХЛ1 in the amount of 3 pcs, РГ.II-330/3150 УХЛ1 with drive ПД-14-00 УХЛ1 and ПД-14-010УХЛ1 in the amount of 12 pcs, Transmission Surge Arrester PEXLIM P276-ХН362  in the amount of 6 pcs, bus insulator ШО-330.II-7 УХЛ1 in the amount of 6 pcs.).

Mounted lead and insulation busbar of 330 kV, bus link and descents to high-voltage equipment. Installation of outdoor cabinet has been performed 330 kV open switchyard in the amount of 98 pcs. and supply of boxes under cables.